Study

After the contract has been formalized, our technical team will visit the site along with geologist to identify the best place to carry out the…
After the contract has been formalized, our technical team will visit the site along with geologist to identify the best place to carry out the…

Mobilization

The drilling rig, support truck and staff car will reach the site. Based on the soil and rock formation conditions..
The drilling rig, support truck and staff car will reach the site. Based on the soil and rock formation conditions..

Borehole Drilling

As the Drilling process continues, geological rock samples (cuttings) are taken at 2.5 meter interval, Struck and water rest levels are constantly recorded.
As the Drilling process continues, geological rock samples (cuttings) are taken at 2.5 meter interval, Struck and water rest levels are constantly recorded.

Well casing

Once the borehole has been drilled, it must be lined with UPVC casings. The casing process keeps the well open and protects the earth..
Once the borehole has been drilled, it must be lined with UPVC casings. The casing process keeps the well open and protects the earth..

Well Development

Once the screen, gravel pack, seals and backfill have been installed, the well is developed (flushing). This development aims at repairing the damage..
Once the screen, gravel pack, seals and backfill have been installed, the well is developed (flushing). This development aims at repairing the damage..

Well testing

After development and preliminary tests, a long-duration well test is carried out. Well tests have to be carried out on all newly completed wells..
After development and preliminary tests, a long-duration well test is carried out. Well tests have to be carried out on all newly completed wells..